  1. They lifted the strange structure to the behind the dome itself. Maybe they are switching the cranes and will continue the operation. Still have no idea where it goes, is it part of the ship or is it the part of the lifting equipment of the dome itself? They started attaching the cables yesterday evening, and continued this morning. It took 8 hours before the lifting started so this is pretty complex operation. This was yesterday evening:
  2. Yep and that yellow circle looks like the "winch only" area for the helicopters.
  3. They have been busy with installing the glass panels to the AquaDome, still missing some but not much. Also BOTH funnels were installed today. It was sunset when I took the third photo, so the colors are a bit weird.
  4. Friend took some photos today. They have installed the diving platform on the AquaDome area. Also some LNG/air ventilation funnel on the roof. https://www.instagram.com/p/Cj3c7fzoDzP/?igshid=YmMyMTA2M2Y=
  5. Same pieces, they have now added some white decorations on them.
  6. Yep, the funnels have been there at least from the August when I first time saw them. These photos are from yesterday. At least some of the Azipods are already installed.
  7. Well that photo is taken by me, tho he propably found it from Loyal to Royal's IG profile: https://www.instagram.com/p/Cjk9TrpoXhJ/
  8. Yesterday they brought something from Mobimar, maybe diving platform for Aquadome?
  9. The Royal logo on the starboard side of the ship got installed too!
  10. Theres couple shots from me from yesterday. The place for the dome begins to take shape.
  11. Are those third windows even part of the bridge itself? Or do you mean the main windows which are still covered?
  12. That ship behind the Azipods is Carnival Celebration, and the Center Stage on that ship will be quite similar than on Mardi Gras.
  13. Well yeah, they just usually use the simple yellow rectangles when in need for some lifting supports.
  14. No idea, you tell me 😄 someone said that it might be for lifting the dome into place when the dome is finished or then it might go under the dome.
  15. Some more photos from this morning. They were busy with unloading the Azipods.
×
×