  1. 📷 Janne-Petteri Kumpulainen As Janne-Petteri Kumpulainen pointed out to me in this photo, the shipyard is getting ready for the dome assembly next to the drydock.
  2. Looking at this photo for the Star of the Seas build, I spotted a potential keel section belonging to the Icon 3 (See zoomed in image below). I'm sure that there are other Icon 3 bits in the yard. 🤔 Janne-Petteri Kumpulainen Screen grab from the photo above by Janne-Petteri Kumpulainen
  3. Star of the Seas build, blocks & pieces. 📷 Janne-Petteri Kumpulainen Portion of the ship name visible on the starboard stern section in this screen grab from Janne-Petteri Kumpulainen photo. The port side stern section in this screen grab from Janne-Petteri Kumpulainen photo. Bridge blocks in this screen grab from Janne-Petteri Kumpulainen photo. Aquadome pieces scattered in the shipyard in this screen grab from Janne-Petteri Kumpulainen photo.
  4. Star of the Seas bow sections incoming. 📷 Janne-Petteri Kumpulainen
  5. It's a stern block that is part of the area hanging over the aft end of Surfside. Here is Icon's similar block. 🙂
  6. The ongoing construction of Star of the Seas 📷_welcome
  7. Star of the Seas lit up at night. 📷 Janne-Petteri Kumpulainen Mein Schiff 7 Zoom in on Aquadome section.
  8. More Star of the Seas' blocks onboard Meri. 📷 Janne-Petteri Kumpulainen
  9. The Pearl onboard the Star of the Seas. 📷 @Eremita85
  10. From article... www.portalmorski.pl/wiadomosci/stocznie-statki/54935-polski-udzial-w-budowie-najwiekszych-wycieczkowcow-swiata A large block for the Meyer Turku ship (NB-1402 or 1402 / "Icon 3") is currently being built at the Crist SA shipyard in Gdynia. The scope of work and delivery of the Crist shipyard includes the construction of a fully equipped floating block with dimensions of 94×48×15 m for deck no. 3 of the third 'Icon' class unit. The weight of the floating block itself will be approximately 5,200 tons, and the weight of the equipment will be approximately 2,500 tons. The main elements of the block include two LNG fuel tanks. The handover of the block is planned for autumn 2024.
  11. From Port of Turku on Instagram: Last week, quite a pearl passed through our port. It is an element manufactured by Mobimar for a cruise ship under construction at the Meyer shipyard. The element weighing about 150 tons was moved by self-propelled trailer onto a barge and then by sea to Meyer's shipyard. #projectloading #throughtheport #meyerturku #becausetimematters #kunajallaonmerkitystä
  12. iconoftheseascrew_1706361139481154.mp4 🎥 iconoftheseascrew
  13. Crown's Edge 143d3859c560be62efdaa39ee867e757.mp4
  14. Tempted, but not at $90. 😜 60986b6f7d420060d15fa4f30b8c97a8.mp4
  15. Yup. I don't buy them. So the least that I can do is snap a photo of them #leapingtimbits as I refer to them when I go in to buy a coffee. 😜 🏀🏀🏀
×
×