jaydee6969 Posted October 10, 2022 #376 Share Posted October 10, 2022 P&O float out video 2 1 Link to comment Share on other sites More sharing options...
jaydee6969 Posted October 10, 2022 #377 Share Posted October 10, 2022 P&O video with Captain Robert Camby, with older interior footage. 3 1 Link to comment Share on other sites More sharing options...
jaydee6969 Posted October 11, 2022 #378 Share Posted October 11, 2022 P&O video of build so far. 1 Link to comment Share on other sites More sharing options...
jaydee6969 Posted October 12, 2022 #379 Share Posted October 12, 2022 Nice video from TTG Media Ltd, with some internal views of work in progress. 3 1 Link to comment Share on other sites More sharing options...
jaydee6969 Posted October 18, 2022 #380 Share Posted October 18, 2022 This weeks Meyer Werft webcam update. 1 Link to comment Share on other sites More sharing options...
jaydee6969 Posted October 21, 2022 #381 Share Posted October 21, 2022 Funnel stacks and pieces for Arvia. River Ems conveyance soon - 5th November????? @molecrochip any clues?? Videos - EMS-Dollart Media 2 1 Link to comment Share on other sites More sharing options...
molecrochip Posted October 22, 2022 #382 Share Posted October 22, 2022 A couple of dates stick in the mind. One this month, one next. Very much weather dependent at this time of year. Conveyance won't happen if high winds. 1 2 Link to comment Share on other sites More sharing options...
jaydee6969 Posted October 27, 2022 #383 Share Posted October 27, 2022 Sorry, this weeks photo was a bit 'delayed'. Meyer Werft webcam. 2 Link to comment Share on other sites More sharing options...
wowzz Posted October 27, 2022 #384 Share Posted October 27, 2022 5 minutes ago, jaydee6969 said: Sorry, this weeks photo was a bit 'delayed'. A bit like the ship then ! 7 Link to comment Share on other sites More sharing options...
besberry Posted October 27, 2022 #385 Share Posted October 27, 2022 Still no funnel, then! Link to comment Share on other sites More sharing options...
molecrochip Posted October 31, 2022 #386 Share Posted October 31, 2022 On 10/27/2022 at 2:17 PM, besberry said: Still no funnel, then! No, because when the ship transits the Ems, there is a bridge which the ship won't fit under if the funnel is already installed. The funnel gets installed once the ship arrives at Bremerhaven. The Ems transfer is scheduled for 4/5th November. This was the second of the two dates that I had been told. Its weather dependent however forecast is looking acceptable. 2 Link to comment Share on other sites More sharing options...
yorkshirephil Posted October 31, 2022 #387 Share Posted October 31, 2022 9 minutes ago, molecrochip said: No, because when the ship transits the Ems, there is a bridge which the ship won't fit under if the funnel is already installed. The funnel gets installed once the ship arrives at Bremerhaven. The Ems transfer is scheduled for 4/5th November. This was the second of the two dates that I had been told. Its weather dependent however forecast is looking acceptable. Picked this up earlier, it is in German but google translate helps https://www.elwis.de/DE/dynamisch/BfS/index.php?target=3... Link to comment Share on other sites More sharing options...
besberry Posted October 31, 2022 #388 Share Posted October 31, 2022 3 hours ago, molecrochip said: No, because when the ship transits the Ems, there is a bridge which the ship won't fit under if the funnel is already installed. The funnel gets installed once the ship arrives at Bremerhaven. The Ems transfer is scheduled for 4/5th November. This was the second of the two dates that I had been told. Its weather dependent however forecast is looking acceptable. Phew, maybe I'll be cruising at Christmas after all! Link to comment Share on other sites More sharing options...
Saab4444 Posted October 31, 2022 #389 Share Posted October 31, 2022 3 hours ago, molecrochip said: No, because when the ship transits the Ems, there is a bridge which the ship won't fit under if the funnel is already installed. The funnel gets installed once the ship arrives at Bremerhaven. The Ems transfer is scheduled for 4/5th November. This was the second of the two dates that I had been told. Its weather dependent however forecast is looking acceptable. There is no bridge on the Ems Arvia needs to fit under. Other ships in this class (Aida Nova and Cosma) had their funnel during Ems transit. Maybe a weight and draft issue. Link to comment Share on other sites More sharing options...
molecrochip Posted October 31, 2022 #390 Share Posted October 31, 2022 7 hours ago, Saab4444 said: There is no bridge on the Ems Arvia needs to fit under. Other ships in this class (Aida Nova and Cosma) had their funnel during Ems transit. Maybe a weight and draft issue. Is it power lines then? There is something that it needs to fit under. Even in the same ship class, funnel design tends to be a brand per band design feature. Link to comment Share on other sites More sharing options...
Saab4444 Posted November 1, 2022 #391 Share Posted November 1, 2022 7 hours ago, molecrochip said: Is it power lines then? There is something that it needs to fit under. Even in the same ship class, funnel design tends to be a brand per band design feature. Many years ago there was a power line issue with Norwegian Pearl who hit it and brought darkness over parts of Northern Europe but I believe this is history. Iona also had her funnel I believe. Link to comment Share on other sites More sharing options...
Yorkypete Posted November 1, 2022 #392 Share Posted November 1, 2022 1 hour ago, Saab4444 said: Many years ago there was a power line issue with Norwegian Pearl who hit it and brought darkness over parts of Northern Europe but I believe this is history. Iona also had her funnel I believe. Can anyone check and find out the reason Arvia cannot transit the river? Is it height or is it something else? Link to comment Share on other sites More sharing options...
terrierjohn Posted November 1, 2022 #393 Share Posted November 1, 2022 4 minutes ago, Yorkypete said: Can anyone check and find out the reason Arvia cannot transit the river? Is it height or is it something else? Operational reasons? 6 Link to comment Share on other sites More sharing options...
Saab4444 Posted November 1, 2022 #394 Share Posted November 1, 2022 39 minutes ago, Yorkypete said: Can anyone check and find out the reason Arvia cannot transit the river? Is it height or is it something else? Transit is now scheduled for Nov 5, reason for delay was not river related I trust. 1 Link to comment Share on other sites More sharing options...
yorkshirephil Posted November 1, 2022 #395 Share Posted November 1, 2022 21 hours ago, molecrochip said: Is it power lines then? There is something that it needs to fit under. Even in the same ship class, funnel design tends to be a brand per band design feature. According to the link in my previous post is to do with the Ems barrier and water levels 2 Link to comment Share on other sites More sharing options...
molecrochip Posted November 1, 2022 #396 Share Posted November 1, 2022 Can confirm that Iona’s upper funnel stack was installed after she transited the Ems. 1 Link to comment Share on other sites More sharing options...
jaydee6969 Posted November 1, 2022 #397 Share Posted November 1, 2022 (edited) Hard to find clear photo's of that period due to various lockdowns etc, but similar video to Arvia's of funnel parts being shipped to Eemshaven for installation. Edited November 1, 2022 by jaydee6969 1 Link to comment Share on other sites More sharing options...
jaydee6969 Posted November 2, 2022 #398 Share Posted November 2, 2022 Hopefully the last webcam update from Meyer Werft. Port side lifeboats being hoisted up ready for Ems conveyance. 2 Link to comment Share on other sites More sharing options...
jaydee6969 Posted November 3, 2022 #399 Share Posted November 3, 2022 Update from Meyer Werft on social media: It starts on Saturday: Arvia is expected on the 5th. November around 7 o'clock und in the morning left Papenburg and transferred to Eemshaven. The following schedule applies for the empassage, which can be postponed in short notice according to weather and tide conditions: catch. 06:30 ship in standing position (Papenburg) catch. 7 o'clock passing the dock lock (Papenburg) catch. 11:45 am passing the Friesen Bridge (Weener) catch. 15 o'clock passing the Jann Berghaus Bridge (empty) catch. 18:30 arrival at Emssperrwerk (Gandersum) catch. 10:30 pm happening the roadblock catch. 00:45 am happening in Emden Arriving in Eemshaven is Sunday the 6th. Planned for November. After technical and nautical tests, Arvia will take the course at Bremerhaven for later delivery to P&O Cruises. !! ️But beware! All data are subject to wind and weather conditions, water levels and therefore without guarantee. Time delays are also possible at short notice! 2 Link to comment Share on other sites More sharing options...
jaydee6969 Posted November 5, 2022 #400 Share Posted November 5, 2022 She has left the dock and is now in the Ems. 1 Link to comment Share on other sites More sharing options...