Rob N Kim Posted July 6, 2015 #1 Share Posted July 6, 2015 We were wanting to try something new for our next cruise, so I placed an order for a bottle of tequila to be delivered to our room as a surprise. After doing so, I realized that there wasn't a size listed for the bottle (http://www.carnival.com/FunShops/item/53J/milagro-tequila), though many of the other bottles specify they are 1L (like this one - http://www.carnival.com/FunShops/item/463/gosling-s-black-seal-rum). So, does anyone know if the tequila is also a 1L bottle or not? If it's not, or I simply can't find out ahead of time, does anyone know if it's possible to change the order - and if so, ho? I can't even find evidence in my Carnival account that I ordered it, though I did print out the confirmation. Link to comment Share on other sites More sharing options...
linbobky Posted July 6, 2015 #2 Share Posted July 6, 2015 We were wanting to try something new for our next cruise, so I placed an order for a bottle of tequila to be delivered to our room as a surprise. After doing so, I realized that there wasn't a size listed for the bottle (http://www.carnival.com/FunShops/item/53J/milagro-tequila), though many of the other bottles specify they are 1L (like this one - http://www.carnival.com/FunShops/item/463/gosling-s-black-seal-rum). So, does anyone know if the tequila is also a 1L bottle or not? If it's not, or I simply can't find out ahead of time, does anyone know if it's possible to change the order - and if so, ho? I can't even find evidence in my Carnival account that I ordered it, though I did print out the confirmation. they are 1lt. Link to comment Share on other sites More sharing options...
Rob N Kim Posted July 6, 2015 Author #3 Share Posted July 6, 2015 they are 1lt. Great - Have you gotten one before? Is Milagro any good? I'm not at all familiar with the basic tequila brands that are listed. Link to comment Share on other sites More sharing options...
djvickers Posted July 6, 2015 #4 Share Posted July 6, 2015 Milagro is a nice tequila. You will like it. Fairly smooth Link to comment Share on other sites More sharing options...
tandemcruzr Posted July 6, 2015 #5 Share Posted July 6, 2015 (edited) So, does anyone know if the tequila is also a 1L bottle or not? The photo of the bottle of the bottle shows 75 CL. That would be 3/4 of a liter. Edited July 6, 2015 by tandemcruzr Link to comment Share on other sites More sharing options...
Rob N Kim Posted July 6, 2015 Author #6 Share Posted July 6, 2015 The photo of the bottle of the bottle shows 75 CL. That would be 3/4 of a liter. Well that's not good. I tried the zoom, but really couldn't tell what it said - on either that bottle or the other similarly priced tequila. So, does anyone know if it's possible to change an order?? Link to comment Share on other sites More sharing options...
linbobky Posted July 6, 2015 #7 Share Posted July 6, 2015 Great - Have you gotten one before? Is Milagro any good? I'm not at all familiar with the basic tequila brands that are listed. I don't know about Milagro! but everything I have bought through bon voyage has been 1 lt bottles.:) Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now