Rare Silent Penguin Posted November 7, 2021 #1 Share Posted November 7, 2021 In preparation for our upcoming cruise I checked the MDT's schedule for road closures and construction along our route to the cruise port of Baltimore, and this is what I found. Link to comment Share on other sites More sharing options...
Ilovesailaway Posted November 11, 2021 #2 Share Posted November 11, 2021 On 11/7/2021 at 8:38 AM, Silent Penguin said: this is what I found I clicked on the link and it didn't load. I will be driving to the port of Baltimore on Sunday. Anything I should be aware of? Link to comment Share on other sites More sharing options...
Rare Silent Penguin Posted November 12, 2021 Author #3 Share Posted November 12, 2021 On 11/10/2021 at 10:12 PM, Ilovesailaway said: I clicked on the link and it didn't load. I will be driving to the port of Baltimore on Sunday. Anything I should be aware of? Sorry. This link, maybe? 🙂 See you Sunday. https://mdta.maryland.gov/blog-category/mdta-traffic-advisories/ongoing-work-results-temporary-closures-ramp-east-mccomas 1 Link to comment Share on other sites More sharing options...
Rare 0106 Posted November 13, 2021 #4 Share Posted November 13, 2021 Should be an easy drive south on 95. Once you are through the tunnel, exit 55, Key Highway, is immediately on your right. Enjoy! ( I can’t wait to get back on a ship in February) Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now