We didn't even make it to the final port though (Basel) and Breisach was an arrival at 2am and we were dispatched at 7.30 am in the dark. Several had to disembark at 2.30am for the longer drive to Basel airport.
Is it reasonable to say that on the 10 December that the floods upstream were going to continue, or worsen, especially as early as December 1 ships were already prevented from berthing in Breisach? Was this the kind of information that was readily available at the time? I fully understand that berths were simply unusable. At the point of our departure in Koblenz, after which it became a cobble bus trip, then I'd have been happy to have been given the option to leave. I understand many did, likely at their own cost.